The drywall is up!!!!
This really makes the place look so much better as you can see.


Sharon sanding some boards.
She stripped, sanded, stained and lacquered about 210 boards.
These will be used as part of the walls in the pool room.


Ben getting ready to do some painting


Joel painting the kitchen


Tom and Doug working on the front door.
Not an easy task.



Doug, after doing some sanding.


Ben laying the tile floor in the kitchen.


Ben and Doug putting the primer coat on the walls.


Ben and Jeremy putting up the ceiling tile. 
The place is looking sharper!


Hmmmm....Where to start next?


Phil and Tom Plumbing the kitchen sink


The Tiffany lights over the bar


Tyler, Gage and Mary
The first ones to eat at the bar


A few celebration pictures.....
WE PASSED OUR PLUMBING INSPECTION!!!
from Left to Right:
pic1-Mary, Tom, Doug, Ben, Sharon and Joel III
pic2-Leland, Tom, Doug and Sharon
pic3-Sharon holding the "passed" sticker



Leland wiring one of the fluorescent lights


Joel III and Joel II unpacking the barstools


Sharon hanging the wallpaper on the Cafe side


Joel II and Joel III putting the legs on the tables


Joel III hanging the first picture in Marvs Place


Leland working with some of the light wiring


Leland standing by the meter box after it is finished


Doug hanging some fixtures


Tom hanging some fixtures


The fire suppression guy


Someone working on the kitchen hood


Paul and Joel putting in a hand sink


Doug and Tom putting in one of the front door windows


Joel posing for a painting picture


Sharon painting the bathroom door


Ben working on the bathrooms


Ben and Tony sanding the floors


Ben and Joel brushing Polyurethane on the floors


The finished product


Paul and Ben hanging the Caribou "Ralph"

More pictures coming soon...