The drywall is up!!!!
This really makes the place look so much better as you can see.
Sharon sanding some boards.
She stripped, sanded, stained and lacquered about 210 boards.
These will be used as part of the walls in the pool room.
Ben getting ready to do some painting
Joel painting the kitchen
Tom and Doug working on the front door.
Not an easy task.
Doug, after doing some sanding.
Ben laying the tile floor in the kitchen.
Ben and Doug putting the primer coat on the walls.
Ben and Jeremy putting up the ceiling tile.
The place is looking sharper!
Hmmmm....Where to start next?
Phil and Tom Plumbing the kitchen sink
The Tiffany lights over the bar
Tyler, Gage and Mary
The first ones to eat at the bar
A few celebration pictures.....
WE PASSED OUR PLUMBING INSPECTION!!!
from Left to Right:
pic1-Mary, Tom, Doug, Ben, Sharon and Joel III
pic2-Leland, Tom, Doug and Sharon
pic3-Sharon holding the "passed" sticker
Leland wiring one of the fluorescent lights
Joel III and Joel II unpacking the barstools
Sharon hanging the wallpaper on the Cafe side
Joel II and Joel III putting the legs on the tables
Joel III hanging the first picture in Marvs Place
Leland working with some of the light wiring
Leland standing by the meter box after it is finished
Doug hanging some fixtures
Tom hanging some fixtures
The fire suppression guy
Someone working on the kitchen hood
Paul and Joel putting in a hand sink
Doug and Tom putting in one of the front door windows
Joel posing for a painting picture
Sharon painting the bathroom door
Ben working on the bathrooms
Ben and Tony sanding the floors
Ben and Joel brushing Polyurethane on the floors
The finished product
Paul and Ben hanging the Caribou "Ralph"
More pictures coming soon... |